{"id":3344,"date":"2011-03-16T20:53:49","date_gmt":"2011-03-16T15:23:49","guid":{"rendered":"http:\/\/greenworldinvestor.com\/?p=3344"},"modified":"2011-03-16T20:53:49","modified_gmt":"2011-03-16T15:23:49","slug":"advantagesdisadvantages-of-geothermal-energy-cons-winning-over-pros","status":"publish","type":"post","link":"https:\/\/iiec-india.org\/greenworld\/2011\/03\/16\/advantagesdisadvantages-of-geothermal-energy-cons-winning-over-pros\/","title":{"rendered":"Advantages\/Disadvantages of Geothermal Energy &#8211; Cons Winning over Pros"},"content":{"rendered":"<p>Geothermal Energy is regarded as a poor cousin to its more glamorous  cousins Wind and Solar.Geothermal Energy Capacity has been installed and the growth rate is a  pathetic 3-4% compared to the over 50% CAGR seen for solar energy and  around 30% for Wind Energy.However Geothermal Energy possesses one attribute  that the others do not.Its 24 hour generation capability is a massive  plus compared to the intermittent nature of Wind and Solar  Energy.However long project development time and large capital  investments have deterred fast growth in geothermal energy in the  world.However some countries like Iceland,Indonesia,Philippines and USA  have a strong geothermal energy industry.Note Geothermal Energy has massive use as a heating source for homes and offices,however this article mainly talks from the view of Electricity Generation.<\/p>\n<p><strong>Disadvantages of Geothermal Energy<\/strong><\/p>\n<p>1) <strong>Long Gestation Time Leading to Cost Overruns<\/strong> \u2013  The Gestation  Time for permitting,financing,drilling etc. can easily  take 5-7 years  to develop a geothermal energy field.Compare this to 6  months for a  small wind farm or 3 months for a Solar PV plant<\/p>\n<p>2) <strong>Slow Technology Improvement<\/strong> \u2013 Geothermal Energy  has the  potential to generate 100s of gigawatts of electricity through  new  techniques like EGS.However the technology improvement has been slow   with setbacks.<\/p>\n<p>3) <strong>Financing<\/strong> is the biggest problem in developing  projects  particularly for small project developers in this  industry.There are  few big geothermal developers like Chevron and  Calpine.<\/p>\n<p>4)<strong> Regulations<\/strong> \u2013 Drilling for new geothermal energy  fields,buying of geothermal companies in foreign geographies faces  innumerable hurdles.Magma which is one of the biggest geothermal energy  companies faced massive local opposition in trying to buy an Icelandic  company.This prevents the growth of pureplay geothermal companies in  acquiring a critical scale.<\/p>\n<p>5) <strong>Limited Locations<\/strong> \u2013 Geothermal Energy can only be built in places which have the geological characteristics favorable to generation of geothermal power.Note there have been talk that Enhanced Geothermal Energy (EGS) can lead to a massive increase in the number of locations which can generate Geothermal Energy,however EGS is facing environmental issues.<\/p>\n<p><strong>Advantages of Geothermal Energy<\/strong><\/p>\n<p>1)<strong> Environment Friendly, <\/strong><strong><\/strong> <strong>and Global Warming Mitigation Effects<\/strong> \u2013 Geothermal Energy does not lead  to any major mining activity,does not lead to significant GHG  emissions,does not lead to health hazards like thermal power<\/p>\n<p>2) <strong>No Fuel Cost <\/strong>&#8211; Geothermal Energy does not require any fuel  like most other sources of energy.This is a huge advantage  over other fossil fuels whose costs are increasing at a drastic\u00a0 rate  every year.Electricity prices are increasingly rapidly in most parts of\u00a0  the world much faster than general inflation.Price shocks due to high  fuel costs are a big risk with fossil fuel energy these days<\/p>\n<p>3) <strong>Predictable,24\/7 Power <\/strong>-Geothermal Energy is very predictable and producers power 24 hours a day,7 days as week.Other forms of Renewable Energy   like Solar and Wind Energy are intermittent in nature.The electricity   supply is much more uniform and reliable.<\/p>\n<p>4) <strong>High Load Factor <\/strong>&#8211; The Load Factor for Solar and  Wind  Energy ranges from 15-40% which is quite low compared to Fossil  Fuel  Energy.Geothermal Energy has a load factor of almost 80% which is equal  to  that of Thermal Power and comparable to Nuclear Power.<\/p>\n<p>4)<strong> No Pollution and Deaths-<\/strong> Geothermal Energy does not  lead to pollution disasters like the BP Oil Spill and Coal Deaths which  are directly related to Dirty Energy Production.<\/p>\n<p><strong>Summary<\/strong><\/p>\n<p>Geothermal Energy has a number of Pros and Cons just like other sources of Renewable and non-Renewable Energy.However the Cons are currently winning over the Pros as even big geothermal companies like Ormat,Magma Energy etc are looking to diversify into other energy fields.While there are countries like Indonesia and Philippines which are pushing for geothermal energy development,it looks unlikely that Geothermal will challenge the dominance of Solar and Wind Energy.<\/p>\n<p><strong>Other Greenworldinvestor Articles that expand on this one<\/strong><\/p>\n<ol>\n<li><a href=\"..\/2011\/03\/13\/tidal-wave-energy-quick-guide-to-costsinvestment-and-how-tidal-generators-produce-tidal-power\/\">Tidal Wave Energy \u2013 Quick Guide to Costs,Investment and How Tidal Generators Produce Tidal Power<\/a><\/li>\n<li><a href=\"..\/2011\/03\/03\/advantages-of-solar-energy-declining-cost-the-biggest-one\/\">Advantages of Solar Energy \u2013 Declining Cost the Biggest One<\/a><\/li>\n<li><a href=\"..\/2011\/02\/17\/list-of-geothermal-energy-companies-in-india-stuck-in-a-limbo\/\">List of Geothermal Energy Companies in India \u2013 Stuck in a Limbo<\/a><\/li>\n<li><a href=\"..\/2010\/09\/15\/sumitomo-green-industry-strategy-is-quite-unconventional-with-battery-recyclingcarbon-trading-and-geothermal-energy-ventures\/\">Sumitomo Green Strategy is quite Unconventional with Battery Recycling,Carbon Trading and Geothermal Energy ventures<\/a><\/li>\n<li><a href=\"..\/2010\/09\/09\/after-solar-and-windcanadian-energy-behemoth-enbridge-dips-its-feet-into-geothermal-energy-as-well\/\">After Solar and Wind,Canadian Energy Behemoth Enbridge Dips its Feet into Geothermal Energy as well<\/a><\/li>\n<li><a href=\"..\/2010\/09\/05\/indias-tata-power-looks-to-become-a-geothermal-energy-leadertargets-25-from-renewable-sources-by-2017\/\">India\u2019s Tata Power looks to become a Geothermal Energy Leader,Targets 25% from Renewable Sources by 2017<\/a><\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Geothermal Energy is regarded as a poor cousin to its more glamorous cousins Wind and Solar.Geothermal Energy Capacity has been installed and the growth rate is a pathetic 3-4% compared to the over 50% CAGR seen for solar energy and around 30% for Wind Energy.However Geothermal Energy possesses one attribute that the others do not.Its 24 hour generation capability is a massive plus compared to the intermittent nature of Wind and Solar Energy.However long project development time and large capital investments have deterred fast growth in geothermal energy in the world.However some countries like Iceland,Indonesia,Philippines and USA have a strong geothermal energy industry.Note Geothermal Energy has massive use as a heating source for homes and offices,however this article mainly talks from the view of Electricity Generation.<\/p>\n","protected":false},"author":54,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","content-type":"","footnotes":""},"categories":[25,40],"tags":[387,1118,1186,1262,1373,1685,1720,1765,1951,2125,2243,2256,3138,3765,4180,5291,5746],"class_list":["post-3344","post","type-post","status-publish","format-standard","hentry","category-fossil-fuels","category-renewable-energy","tag-alternative-energy","tag-clean-technology","tag-competition","tag-cost-overrun","tag-debt","tag-electricity","tag-energy","tag-environment","tag-financing","tag-geothermal-renewable-energy-greeninvest","tag-government","tag-green","tag-investment","tag-ngo","tag-project-management","tag-subsidy","tag-utility"],"_links":{"self":[{"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/posts\/3344","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/users\/54"}],"replies":[{"embeddable":true,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/comments?post=3344"}],"version-history":[{"count":0,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/posts\/3344\/revisions"}],"wp:attachment":[{"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/media?parent=3344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/categories?post=3344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/tags?post=3344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}