{"id":3221,"date":"2011-03-10T11:20:19","date_gmt":"2011-03-10T05:50:19","guid":{"rendered":"http:\/\/greenworldinvestor.com\/?p=3221"},"modified":"2011-03-10T11:20:19","modified_gmt":"2011-03-10T05:50:19","slug":"indian-green-news-gujarat-sees-solar-delaysgamesa-to-increase-investmentleitner-shriram-to-sell-3-mw-in-europe","status":"publish","type":"post","link":"https:\/\/iiec-india.org\/greenworld\/2011\/03\/10\/indian-green-news-gujarat-sees-solar-delaysgamesa-to-increase-investmentleitner-shriram-to-sell-3-mw-in-europe\/","title":{"rendered":"Indian Green News &#8211; Gujarat sees Solar Delays,Gamesa to increase investment,Leitner Shriram to sell 3 MW in Europe"},"content":{"rendered":"<p>Interest in India&#8217;s Renewable Sector is growing by the day with massive potential in Wind,Solar,Biomass\u00a0 and Nuclear Energy.Renewable Energy in India is going to more than quadruple in capacity over the next decade providing amply growth and profit opportunities.Foreign and domestic makers are already making a beeline to the Indian market to get a first mover advantage.Here are some of the main news in the Green Industry Space in India<\/p>\n<p><strong>Understanding Indian Renewable Energy<\/strong><\/p>\n<ol>\n<li><a href=\"..\/2010\/11\/26\/renewable-energy-in-india-pastpresent-and-future\/\">Renewable Energy in India \u2013 Past,Present and Future<\/a><\/li>\n<li><a href=\"..\/2010\/09\/27\/green-invsting-in-india-how-tamil-nadu-became-the-biggest-alternative-energy-state\/\">Green Investing in India \u2013 How Tamil Nadu became the Biggest Alternative Energy State<\/a><\/li>\n<li><a href=\"..\/2010\/08\/23\/how-to-make-green-investments-in-india-renewable-energy-focused-power-india-utilities\/\">How to make Green Investments in India \u2013 Renewable Energy Focused Power Utilities<\/a><\/li>\n<li><a href=\"..\/2010\/08\/17\/indian-wind-energy-company-suzlon-fallen-angel-or-falling-knife\/\">Indian Wind Energy Company Suzlon \u2013 Fallen Angel or Falling Knife<\/a><\/li>\n<li><a href=\"..\/2010\/08\/03\/green-energy-in-india-gets-unexpected-boost-as-central-electricity-regulatory-commission-cerc-mandates-6-renewable-energy-generation\/\">Green  Energy in India gets unexpected boost as Central Electricity Regulatory  Commission (CERC) mandates 6% Renewable Energy generation<\/a><\/li>\n<li><a href=\"..\/2010\/07\/17\/green-investing-in-india-favorable-government-policies-make-gujarat-a-top-renewable-energy-destination\/\">Green Investing in India \u2013 Favorable government policies make Gujarat a top Renewable Energy destination<\/a><\/li>\n<li><a href=\"..\/2010\/09\/20\/analyzing-renewable-energy-utility-orient-green-power-ipo-great-sector-and-growth-plansexecution-is-the-question\/\">\u201cOrient Green Power\u201d IPO Analysis- Focused Renewable Energy Utility with Fast Growth Plans however Execution is the Question<\/a><\/li>\n<li><a href=\"..\/2010\/10\/24\/solar-power-companies-in-india-growing-by-the-day-but-a-long-way-to-go\/\">Solar Power Companies in India Growing by the Day but a Long Way to Go<\/a><\/li>\n<li><a href=\"..\/2010\/10\/18\/list-of-wind-energy-companies-in-india-pretenders-or-world-beaters\/\">List of Wind Energy Companies in India \u2013 Pretenders or World Beaters<\/a><\/li>\n<li><a href=\"..\/2011\/02\/17\/list-of-top-renewable-energygreencleantech-companies-in-india-which-are-publicly-listed\/\">List of Top Renewable Energy\/Green\/CleanTech Companies in India which are Publicly listed<\/a><\/li>\n<\/ol>\n<p><strong>India Green News<\/strong><\/p>\n<h4 id=\"hn-headline\"><a href=\"http:\/\/www.google.com\/hostednews\/afp\/article\/ALeqM5jXQocFVyLpOrIAxAIvSP9fZLJ96A?docId=CNG.4d0972a5d5ba233b46fb820a5ebf0e0c.401\">Spain&#8217;s Gamesa plans major investment in India<\/a><\/h4>\n<blockquote>\n<div>\n<p>Spain&#8217;s Gamesa, one of the world&#8217;s top wind turbine groups, said  Wednesday it plans to invest 60 million euros ($83 million) in new  plants in India, which accounts for 8.0 percent of its worldwide sales.Gamesa  &#8220;continues to expand its presence in fast-growing markets, this time in  India, where the company has announced that it will invest more than 60  million euros through 2012 to build new manufacturing plants,&#8221; it said.<\/p>\n<p>The  group plans to open a turbine blade factory in northwestern Gujarat  state this year, with initial production capacity of 300 MW.<\/p>\n<\/div>\n<\/blockquote>\n<h4><a href=\"http:\/\/www.financialexpress.com\/news\/leitner-shriram-set-to-enter-europe\/760175\/0\"><strong>Leitner Shriram set to enter Europe<\/strong><\/a><\/h4>\n<blockquote><p>Leitner Shriram Manufacturing, a joint venture between the Leitner Group  of Italy and Shriram EPC for manufacture of wind turbine generators  (WTGs), is gearing up for the european market with 3mw turbines.<\/p>\n<p>The company is preparing a prototype with different designs and will  get it tested in Europe. Based on results, which is likely to be out  during March 2012, it will decide on launching the 3mw turbines  commercially. Besides, in the domestic market, the firm is looking at  testing 2mw capacity turbines for class I wind sites and 1.5mw turbines  for class III sites, which have low wind speed. The components required  for these turbines are being sourced from international and domestic  markets. The testing is expected to be done by September and by April  2012, the company would decide on their introduction.<\/p><\/blockquote>\n<h4><a href=\"http:\/\/noir.bloomberg.com\/apps\/news?pid=newsarchive&amp;sid=a4XBtlTKDYDs\">Delayed Solar-Power Plants Face Fines as Gujarat Sets Precedent<\/a><\/h4>\n<blockquote><p>Gujarat state has led India\u2019s nascent solar industry, awarding licenses for 959 megawatts to developers seeking a foothold in a state-subsidized renewable energy market. The first 48.5 megawatts were required start operating by Dec. 31, according to a list obtained by Bloomberg News from <a href=\"http:\/\/www.gseb.com\/guvnl\/index.aspx\" target=\"_blank\" rel=\"noopener\">Gujarat Urja Vikas Nigam Ltd.<\/a>, the state-run company that will buy the power.<\/p>\n<p>Companies agreed to penalties that were laid out in their power purchase agreements, Patil said. \u201cThey will be charged accordingly,\u201d he said. The penalties for delays in beginning operations are 10,000 rupees ($222) a day per megawatt for the first 60 days and 15,000 rupees thereafter, according to the state power company that contracted to buy the electricity.<\/p>\n<p><a href=\"http:\/\/noir.bloomberg.com\/apps\/quote?ticker=LANCI%3AIN\">Lanco Infratech Ltd.,<\/a> the Hyderabad-based developer that completed its 5-megawatt allotment on Dec. 20, is the only company that met the deadline. Five projects awarded to <a href=\"http:\/\/www.azurepower.com\/\" target=\"_blank\" rel=\"noopener\">Azure Power<\/a> of New Delhi, Zeba Solar, Germany\u2019s <a href=\"http:\/\/www.dreisatz-dresden.com\/Company_profile\/company_profile.html\" target=\"_blank\" rel=\"noopener\">Dreisatz GmbH<\/a> and MI MySolar24 Ltd. weren\u2019t completed.<\/p><\/blockquote>\n<h4><a href=\"http:\/\/in.news.yahoo.com\/gamesa-ceo-says-no-plans-buy-stake-suzlon-20110308-233719-624.html\">Gamesa CEO says no plans to buy stake in Suzlon<\/a><\/h4>\n<blockquote><p>Spanish wind turbine maker Gamesa has no plans to buy a stake in India&#8217;s Suzlon Energy, its chief executive said on Wednesday.<\/p>\n<p>Jorge Calvet also said the company had no plans for a partnership with Suzlon.<\/p>\n<p>Local media had earlier reported that Gamesa could buy a stake in  Suzlon. The Indian company has also denied any stake sale plans.<\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Interest in India&#8217;s Renewable Sector is growing by the day with massive potential in Wind,Solar,Biomass  and Nuclear Energy.Renewable Energy in India is going to more than quadruple in capacity over the next decade providing amply growth and profit opportunities.Foreign and domestic makers are already making a beeline to the Indian market to get a first mover advantage.Here are some of the main news in the Green Industry Space in India<\/p>\n","protected":false},"author":54,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","content-type":"","footnotes":""},"categories":[75,86,88,40,45,52,69],"tags":[1118,1186,1373,1685,1765,2125,2173,2243,2256,3485,3549,5746],"class_list":["post-3221","post","type-post","status-publish","format-standard","hentry","category-biomass-renewable-energy-greeninvest","category-energy-indian-capital-markets","category-finance-indian-capital-markets","category-renewable-energy","category-solar-renewable-energy-greeninvest","category-solar-panels","category-wind-renewable-energy-greeninvest","tag-clean-technology","tag-competition","tag-debt","tag-electricity","tag-environment","tag-geothermal-renewable-energy-greeninvest","tag-global-warming","tag-government","tag-green","tag-ma","tag-marketshare","tag-utility"],"_links":{"self":[{"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/posts\/3221","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/users\/54"}],"replies":[{"embeddable":true,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/comments?post=3221"}],"version-history":[{"count":0,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/posts\/3221\/revisions"}],"wp:attachment":[{"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/media?parent=3221"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/categories?post=3221"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iiec-india.org\/greenworld\/wp-json\/wp\/v2\/tags?post=3221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}